• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
January 16,2025

Bihar Electricity Regulatory Commission (Green Energy Open Access) Regulations, 2024

The objective of these regulations is to provide a methodology for the determination of Open Access charges and Banking charges for Green Energy Open Access consumers.

These  regulations  shall  be  applicable  for  allowing  Connectivity  and  Open  Access  to electricity  generated  from  green  energy  sources  as  defined  under clause (1) (m) of Regulation 3 of these Regulations, including the energy from non-fossil fuel-based Waste-to-Energy plant for use of Intra-State Transmission System (InSTS) and/or distribution system  in  the  State  or  both,  including  Intra-State  Transmission  or  Distribution System(s),which are incidental to Inter-State Transmission of electricity.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related