Top Articles
Read allCentral
Read allNTPC REL Issues EPC Tender for 600 MW Grid Connected Solar Project at Dhule Maharashtra
NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Green Energy Limited, has issued an Invitation for Bids (IFB No. NRE-CS-5820-004(EPC)-9) for the EPC development of a 600 MW Read more
MNRE: Revised Guidelines for Installation of prototype Wind Turbine Models
Amendment to the "Revised Guidelines for installation of prototype wind turbine models"- Reg.1. The undersigned is directed to refer ”Revi... Read more
MNRE: Clarification/ Amendment to ALMM OM dated 25.05.2026 – for RE Power Projects other than Rooftop Solar Projects
The Ministry of New and Renewable Energy (MNRE) has issued an important clarification on ALMM List-II compliance for utility-scale and comme... Read more
CERC: Reviews Tariff Truing-Up and New Tariff for 240 MW Uri-II Hydroelectric Project of NHPC
Petition for truing-up of tariff for the period 2019-24 and determination of tariff for the period 2024-29 in respect of Uri-II Hydroelectri... Read more
CERC: Considers Tariff for Ghatampur Thermal Power Station of Neyveli Uttar Pradesh Power Limited
Petition for determination of tariff of Ghatampur Thermal Power Station (1980 MW) of Neyveli Uttar Pradesh Power Limited from the date of CO... Read more
State
Read allPSERC: Punjab State Electricity Regulatory Commission (Forum and Ombudsman) (3rd Amendment) Regulations, 2026
In exercise of the powers conferred under Section 181 read with other provisions of the Electricity Act, 2003 (36 of 2003) and all other powers enabling the Commission in this behalf, the Punjab State Read more
PSERC: Petition of PSPCL for enhancement of monetary limits of the respective forums
Petitioner: Punjab State Power Corporation Limited Background: The present petition has been filed by PSPCL for enhancement of the... Read more
PSERC: Petition of PSPCL v/s Thind Power for power procurement from 2MW Mini Hydel Project at tariff of Rs. 3.70 per kWh
Petitioner: Punjab State Power Corporation LimitedVersusM/s Thind Power Private Limited & Punjab Energy Development AgencyBack... Read more
PSERC: Petition of PSPCL v/s SJVN Limited for approval of procurement of 340MW Firm and Dispatchable Renewable Energy
Petitioner: Punjab State Power Corporation LimitedVersusSJVN Limited, Ganeko One Energy Private Limited & Avaada Energy Private LimitedBa... Read more
Bid Updates
Read allNTPC REL Issues EPC Tender for 600 MW Grid Connected Solar Project at Dhule Maharashtra
NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Green Energy Limited, has issued an Invitation for Bids (IFB No. NRE-CS-5820-004(EPC)-9) for the EPC development of a 600 MW Read more
SECI Issues Tender for 70 MW Solar Project with 25 MW/50 MWh BESS in Andhra Pradesh
The Solar Energy Corporation of India (SECI) has initiated the development of a 50 MW Firm and Dispatchable Renewable Energy (FDRE) Project ... Read more
GUVNL Invites Bids for 450 MW / 900 MWh Standalone BESS Projects with VGF in Gujarat
Gujarat Urja Vikas Nigam Limited (GUVNL) has issued a Request for Selection (RfS) dated 22 June 2026 for the development of 450 MW / 900 MWh... Read more
NTPC REL Issues Tenders for 813 MW (271 WTGs) Wind Project in Davangere, Karnataka
NTPC Renewable Energy Limited (NTPC REL) has invited bids for the Supply and Installation of Wind Turbine Generators (WTGs) for an ISTS-conn... Read more
NGEL Issue EPC Tender for1100 MW / 3300 MWh BESS Project at Khavda Solar Plant in Gujarat
NTPC Green Energy Limited (NGEL), a subsidiary of NTPC Limited, has invited bids for the Engineering, Procurement and Construction (EPC) pac... Read more
Open Access
Read allCSERC: Petition of Hi-Tech Power & Steel v/s CSPDCL for permission for availing open access to draw power
Petitioner: M/s Hi-Tech Power and Steel Pvt. Ltd.VersusChhattisgarh State Power Distribution Co. Ltd., Chhattisgarh State Power Tr... Read more
DERC: DERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026
Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 20262.0 Amendment... Read more
CERC: Petition for Challenging Open Access Regulation and Curtailment of 300 MW Power Project
Petition under Sections 79(1)(c) and 79(1)(f) of the Electricity Act, 2003 (“Act”), challenging the regulation of open access and conseq... Read more
MPERC: MPERC (Verification of Captive Generating Plants and Captive Users) Regulations 2023, Second Amendment
Madhya Pradesh Electricity Regulatory Commission (Verification of Captive Generating Plants and Captive Users) Regulations, 2023, Second Ame... Read more