Top Articles
Read all
Central
Read allCERC: Application seeking Issuance of Ex-parte ad Interim Directions
Application seeking issuance of ex-parte ad interim directionsHexa Climate Solutions Private Limited, Adyant Power Private Limited & Banyan Energy Private LimitedVersusCentral Transmission Utility Read more
CERC: Petition for Seeks Pass Through of Energy Charges Based on Actual Fuel Costs
Petition under Section 79 of the Electricity Act, 2003 read with the provisions of the Power Supply Agreement dated 5.1.2011 and Power Purch... Read more
CERC: Approval Sought for Hypothecation of Transmission Assets in Favor of Security Trustee
Petition seeking approval under Section 17(3) and Section 17(4) of the Electricity Act, 2003 read with Article 15.2.2 of the Transmission Se... Read more
Aptel Order SSUPL vs CERC; RE No. 5 of 2025; Solar Review Petition Partly Allowed; Interest Awarded, Claims Rejected
Solaire Surya Urja Pvt. Ltd.VersusCentral Electricity Regulatory Commission, NTPC Limited, NTPC Vidyut Vyapar Nigam Limited, Rajasthan So... Read more
Aptel Order SEUPPTCL vs UPERC; APPEAL 119 of 2019; Appeal Dismissed; Commission Directed to Finalize Tariff Petition
South East U.P. Power Transmission Company LimitedVersusUttar Pradesh Electricity Regulatory Commission, Uttar Pradesh Power Transmission Co... Read more
State
Read allOERC: Petition of OPGC for determination of Generation Tariff of OPGC Units 1 & 2 for the FY 2026-27
Petitioner: Odisha Power Generation Corporation (OPGC) LtdBackground: The petitioner, Odisha Power Generation Corporation (OPGC) Ltd has filed an application before the Commission for determ Read more
MPERC: Petition of MPPGCL v/s MPPMCL for True-up of Generation Tariff of Thermal and Hydro Power Stations for FY 2024-25
Petitioner: M.P. Power Generating Company Ltd, JabalpurVersusM.P. Power Management Company Ltd., M.P. Power Transmission Co. Ltd., Raja... Read more
MPERC: Petition for determination of ARR & Retail Supply Tariff for FY 2026-27 filed by the Distribution Licensees
Petitioner: Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (East DISCOM), Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co... Read more
MPERC: Petition for determination of True-up of ARR for FY 2024-25 based on Petition filed by the Distribution Licensees
Petitioner: Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (East DISCOM), Madhya Pradesh Paschim Kshetra Vidyut Vitaran Co... Read more
GERC: Petition of Panara Craft LLP v/s DGVCL for extension of date of grid connectivity & commissioning of 7.8MW SPP
Petitioner: Panara Craft LLPVersusDakshin Gujarat Vij Company Limited & Gujarat Energy Transmission Corp. LimitedBackground:&n... Read more
Bid Updates
Read allNTPC REL Issues Tender for 813 MW Wind Project in Karnataka
NTPC Renewable Energy Limited (NTPC REL) has issued a tender for the supply and installation of wind turbine generators (WTGs) for an 813 MW wind power project in Bellary. The project will involve the Read more
NTPC REL Issue EPC Tender for 900 MW (3×300 MW) Grid Connected Solar PV Project in Mandsaur, Madhya Pradesh
Invitation for Bids (IFB) issued by NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Green Energy Limited, for th... Read more
UPPCL Re-Invites Bids for 375 MW/1500 MWh standalone BESS under VGF scheme
The tender continues the process for establishing 375 MW / 1500 MWh standalone Battery Energy Storage Systems (BESS) in Uttar Pradesh with V... Read more
NTPC REL Issues BoS Tender for 200 MW Grid Connectec Solar PV Project at Bikaner, Rajasthan
Balance of System (BOS) Package for 200 MW Solar PV Project – NTPC REL, Bikaner, RajasthanNTPC Renewable Energy Limited (NTPC REL) has iss... Read more
WBSEDCL Issue tender for 500 MW/2000 MWh Standalone BESS at Multiple Location in West Bengal
The Department of Power West Bengal has initiated a major energy infrastructure push by inviting bids for developing 500 MW / 2000 MWh of st... Read more
Open Access
Read allAptel Order PTC vs CERC; APPEAL 242 of 2019; PTC Directed to Refund Excess Charges, Appeal Dismissed
PTC India LimitedVersusCentral Electricity Regulatory Commission, Korba Power Limited, Power Grid Corporation of India, Haryana Power Purchase Centre, Chhattisgarh State Power Trad Read more
TGERC: Petition of TGSPDCL & TGNPDCL for determination of additional surcharge to be levied on Open Access Consumers
Petitioner: Southern Power Distribution Company of Telangana Limited (TGSPDCL) & Northern Power Distribution Company of Telang... Read more
CERC: Petition for Adoption of Tariff for SJVNL's 1000 MW Solar PV Project Connted to ISTS
Petition under section 63 of the Electricity Act, 2003, for adoption of usage charges for a 1000 MW Solar Photovoltaic (PV) power station (T... Read more
Aptel Order SCL vs KERC; APPEAL 58 of 2020; Shree Cement Challenges KERC Order on Deduction on Liquidated Damages
Shree Cement LimitedVersusKarnataka Electricity Regulatory Commission, Power Company of Karnataka Limited (PCKL), BANGALORE ELECTRICITY ... Read more
Aptel Order MSEDCL vs MERC; APPEAL 100 of 2019; MSEDCL Appeal Challenges MERC Order on RattanIndia Open Access Dispute
Maharashtra State Electricity Distribution Company LimitedVersusMaharashtra State Electricity Regulatory Commission (MERC), RattanIndi... Read more