Top Articles
Read all
Central
Read allMNRE: State-wise (Location based) Installed Capacity of Renewable Power as on 31.07.2026
The Ministry of New and Renewable Energy’s state-wise data presents India’s location-based installed renewable energy capacity as of 31 July 2026, covering solar, wind, bio-power, small hydro and Read more
MoC: Monthly Statistics at a Glance of Coal India - July 2026
Coal India Limited’s (CIL) provisional July 2026 statistics indicate a mixed but broadly positive operational performance, with strong mon... Read more
CEA: Report of Committee Report Examines Wear, Tear, O&M and Lifespan Impacts of Flexible Operation
The CEA Committee on Wear & Tear, O&M and Plant Lifespan Implications due to Flexible Operation was constituted following concerns r... Read more
CEA: Report On Ramp Rate compliance framework and Scheduling Methodology for the coal-based Power Plant
The report presents the deliberations held by the Central Electricity Authority (CEA) with generating companies, BHEL and Grid-India on ramp... Read more
CERC RoPs: CERC Reserves NTPC Mining Coal Price Petition for Orders
Petition under Regulation 9 (4) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 ("Tariff... Read more
State
Read allOERC: Petition of GRIDCO Ltd v/s NVVN for post-facto approval of the Power Sale Agreement dated 11.05.2026
Petitioner: GRIDCO LimitedVersusNVVN Ltd., Department of Energy, Government of Odisha, & othersBackground: The Petitioner, M/s GRIDCO Ltd. has filed this application seeking post-facto approval of t Read more
WBERC: Petition of CESC v/s SGE5PL for approval of SPPA (30.06.26) for long-term procurement of 100MW Wind-Solar Project
Petitioner: CESC LimitedVersusSprng Green Energy 5 Private LimitedBackground: CESC Limited ("CESC" or "the Petitioner") submitted a petiti... Read more
WBERC: Petition of WBPDCL for order review dated 19.11.24 in Case OA -450/22-23 for determination of input price of coal
Petitioner: West Bengal Power Development Corporation LimitedBackground: The West Bengal Power Development Corporation Limited ("t... Read more
BERC: Petition of SBPDCL & NBPDCL for approval of supply, installation & commissioning of service cables in connections
Petitioner: South Bihar Power Distribution Company Ltd & North Bihar Power Distribution Company Ltd.Background: The Commission... Read more
BERC: Petition of NBPDCL & SBPDCL for change in Arrear Recovery Mechanism for smart prepaid consumers
Petitioner: North Bihar Power Distribution Company Ltd & South Bihar Power Distribution Company Ltd.Background: The Petitioner... Read more
Bid Updates
Read allMahagenco Issues Tender for Consultancy Services for Uran's 2 KTPA Green Hydrogen and Green Ammonia Project
Mahagenco Renewable Energy Ltd. (MahaGenco REL), Mumbai, has issued the second call for Tender No. MREL/2026-27/GH2 Consultant/T02-A, dated 28 August 2026, for consultancy services related to a propos Read more
SECI Invites Bids for 100 kW Hybrid Rooftop Solar Project at NIWE Chennai
The Solar Energy Corporation of India (SECI) has issued a Request for Proposals (RfP) for selection of a Project Developer to establish a 10... Read more
SECI Issues Tender for 50 MW/100 MWh Standalone Energy Storage System on Short-Term Basis under TariffBased Competitive
The Request for Selection (RfS) issued by the Solar Energy Corporation of India (SECI) seeks bids for utilization of a 50 MW/100 MWh standal... Read more
POWERGRID Issues Tender for 265 MW/530 MWh BESS Project in Haryana
POWERGRID has floated a tender for developing a 265 MW/530 MWh standalone Battery Energy Storage System (BESS) in Haryana, aimed at strength... Read more
SECI's Tender Auction Results for 6000 MWh (1500 MW x 4 Hours) ISTS-Connected RE Power Projects in India (SECI-FDRE-IX)
SECIs Tender Auction Results yield ₹ 5.99/kWh - 6.00/kWh as the least Tariff for RTC Developers (Renewable Power Developers) for Waaree Fo... Read more
Open Access
Read allGERC: GERC (Terms & Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026
Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026Amendment in Regulation 1(4) of the Principal Regulations:Regulation Read more
UERC: Petition of Indian Railways that all drawl points of Railways within state may be treated as a single entity
Petitioner: Indian RailwaysVersusState Load Despatch Center (SLDC), Power Transmission Corporation of Uttarakhand Limited (PTCUL) ... Read more
GERC: Petition of CERA Sanitaryware v/s GETCO against recovery of excess amount of relinquishment charges
Petitioner: CERA Sanitaryware LimitedVersusGujarat Energy Transmission Corp. Limited & Uttar Gujarat Vij Company LimitedBackgr... Read more
Aptel Order BSLvs AVVNL; APPEAL 142 of 2021; APTEL Upholds AVVNL Wheeling Charges, Dismisses BSL Appeal
BSL LtdVersusAjmer Vidyut Vitran Nigam Ltd Background:1. The present Appeal has been filed by M/s. BSL Limited (“Appellant”) challe... Read more
CERC RoPs: Petition for Adani Solar Seeks Exemption from LTA Transmission Charge Liability Under PPA
Petition under Sections 79 of the Electricity Act, 2003 read with Article 4.2.2 of the Power Purchase Agreement dated 20.08.2019 executed be... Read more