The CEA Committee on Wear & Tear, O&M and Plant Lifespan Implications due to Flexible Operation was constituted following concerns raised by NTPC regarding the impact of two-shift operation and 40% Minimum Technical Load (MTL) on coal-based thermal power plants. NTPC reported increased boiler tube leakages, flame failures, generator and turbine failures, and accelerated equipment degradation due to repeated ramping and low-load operation.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.