• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
July 11,2024

CERC (Adoption of Transmission Charges): Transmission Scheme for evacuation of Power from Dhule 2 GW REZ

Petitioner: Dhule Power Transmission Limited, Unit No. 101, First Floor, Windsor, Village Kolekalyan, off CST Road, Vidyanagari Marg, Kalina, Santacruz (East), Mumbai- 400098.

Background: The Petitioner, Dhule Power Transmission Limited, has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) for the adoption of transmission charges in respect of the “Transmission Scheme for evacuation of power from Dhule 2 GWREZ” on a Build, Own, Operate and Transfer (BOOT) basis.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related