• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
October 22,2025

CERC: adoption of Transmission Charges with respect to Transmission System for Evacuation of RE Power from RRETL

Application under Section 63 of the Electricity Act, 2003 for the adoption of Transmission Charges with respect to the Transmission System “Transmission System for Evacuation of RE Power from Raghanesda Area of Gujarat – 3 GW under Phase-I” being established by Raghanesda RE Transmission Limited.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related