Approval under Regulation 86 of the Central Electricity Regulatory Commission
(Conduct of Business) Regulations, 1999 and revision of transmission tariff of the
2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-
19 tariff period under the Central Electricity Regulatory Commission (Terms and
Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the
2019-24 tariff period under the Central Electricity Regulatory Commission (Terms
and Conditions of Tariff) Regulations, 2019 in respect of the Combined Asset
comprising of Asset-a: 400 kV D/C Kanpur-Auraiya transmission line along with bays
at Auraiya, Asset-b: Two Numbers 400 kV bays at Kanpur Sub-station associated
with 400 kV Kanpur-Auraiya transmission line, Asset-c: LILO of 400 kV D/C BareillyMandola transmission line at Bareilly and Bus Reactor at Bareilly, Asset-d: LILO of
400 kV S/C Lucknow-Moradabad transmission line at Bareilly, Asset-e: LILO of 400
kV Lucknow (UPPCL)-Sultanpur (UPPCL) at Lucknow, Asset-f: 80 MVAR, 420 kV
Bus Reactor at Lucknow Sub-station and Asset-g: 400 kV Bareilly-Moradabad
transmission line along with associated bays under Northern Region System
Strengthening Scheme-I in Northern Region.