• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
July 24,2026

CERC: Considers POWERGRID Mahan Rewa Transmission Licence for Madhya Pradesh Evacuation Project

Application under Sections 14 & 15 of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2024 with respect to POWERGRID Mahan Rewa Transmission Limited.

POWERGRID Mahan Rewa Transmission Limited (PMRTL), 

Versus

Central Transmission Utility of India Limited, PFC Consulting Limited, Chhatisgarh State Power Distribution Company Limited, &  25 Other

Background:

The Petitioner, POWERGRID Mahan Rewa Transmission Limited, (erstwhile MEL Power Transmission Limited), has filed the present Petition for the grant of a transmission licence under Sections 14 and 15 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) read with the Central Electricity Regulatory Commission (Procedure, Terms, and Conditions for grant of Transmission Licence and other related matters) Regulations, 2024 (hereinafter referred to as “the Transmission Licence Regulations”) to establish “Transmission System for evacuation of power from Mahan Energen Limited Generating Station in Madhya Pradesh” (hereinafter referred to as “the Project”) on Build, Own, Operate and Transfer Basis consisting of the following elements: 

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related