June 05,2024

Ishanagar Power Transmission seeks Section 63 of the Electricity Act, 2003 for the adoption of transmission charges

The Petitioner, Ishanagar Power Transmission Limited, has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) for the adoption of transmission charges in respect of the “Transmission System for Western Region Expansion Scheme XXXIII (WRES-XXXIII): Part C” on a Build, Own, Operate and Transfer (BOOT) basis.