Petition under Section 63 of the Electricity Act, 2003 for the adoption of tariff for 1200 MW Inter-State Transmission System (ISTS) connected Solar PV Power Projects with 600 MW/1200 MWh Energy Storage Systems (ESS) and selected through a competitive bidding process (SECI-ISTS-XV) as per the Guidelines of the Government of India
Solar Energy Corporation of India Limited,
Versus
Pace Digitek Infra Private Limited, Hero Solar Energy Private Limited, ACME Solar Holdings Limited & 4 Others
Background:
The Petitioner, Solar Energy Corporation of India Limited (‘SECI’) has filed the present Petition for the adoption of the tariff of the 1200 MW Solar PV Power Projects with 600 MW/1200 MWh Energy Storage Systems (ESS) (SECI-ISTS-XV) connected with the Inter-State Transmission System (ISTS) and selected through the competitive bidding process as per the “Guidelines for Tariff Based Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems” dated 09.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.