• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
March 06,2025

CERC: Petition for adoption of Transmission Charges to Transmission System of POWERGRID Kurawar Transmission Limited

Application under Section 63 of the Electricity Act, 2003 for the adoption of Transmission Charges with respect to Transmission System Being established by the POWERGRID Kurawar Transmission Limited (erstwhile Rajasthan IV H1 Power Transmission Limited). 

POWERGRID Kurawar Transmission Limited

Versus

Central Transmission Utility of India Limited, REC Power Development and Consultancy Limited & 27 Others

Background:

The Petitioner, POWERGRID Kurawar Transmission Limited (erstwhile Rajasthan IV H1 Power Transmission Limited) (hereinafter referred to as “the Petitioner”), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as ‘the Act') for the adoption of transmission charges in respect of “Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part-2 :5.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related