Petition under Section 63 of the Electricity Act, 2003 for the adoption of transmission charges with respect to the transmission system to be implemented by NER Expansion Transmission Limited (a 100% wholly owned subsidiary of Resonia Limited-erstwhile Sterlite Grid 32 Limited).
NER Expansion Transmission Limited,
Versus
Central Transmission Utility of India Limited, PFC Consulting Limited, Department of Power, Government of Arunachal Pradesh & 8 Others
Background:
The Petitioner, NER Expansion Transmission Limited, (hereinafter referred to as “the Petitioner”), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) for the adoption of transmission charges with respect to the “North Eastern Region Expansion Scheme-XXV (NERES-XXV) Part-A” (hereinafter referred to as 'Project’) on a Build, Own, Operate and Transfer Basis (hereinafter referred to as “BOOT Basis”).
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.