Application under Section 63 of the Electricity Act, 2003 for the adoption of Transmission Charges with respect to the Transmission System being established by POWERGRID KPS 1 and 2 Augmentation Transmission Limited, (erstwhile Khavda V-B1B2 Power Transmission Limited)
POWERGRID KPS 1 and 2 Augmentation Transmission Limited,
Versus
Central Transmission Utility of India Limited, REC Power Development and Consultancy Limited, Adani Green Energy Limited & 26 Others
Background:
The Petitioner, POWERGRID KPS 1 and 2 Augmentation Transmission Limited (erstwhile Khavda V-B1B2 Power Transmission Limited), has filed the present Petition under Section 63 read with Section 79(1)(c) & (d) of the Electricity Act, 2003 (hereinafter referred to as “the Act”) seeking the adoption of transmission tariff discovered through the tariff based competitive bidding process for the purpose of selection of the Bidder as the Transmission Service Provider (hereinafter referred to as “TSP”) to establish the Inter-State Transmission System for the “Augmentation of transformation capacity at KPS1 (GIS) and KPS2 (GIS) (Phase-V Part B1 and Part B2 scheme)” on a Build, Own, Operate and Transfer Basis (hereinafter referred to as “BOOT Basis”).
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.