• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
May 26,2025

CERC: Petition for adoption of transmission charges with respect to the Transmission System, RIV4APTL

Application under Section 63 of the Electricity Act, 2003 for the adoption of transmission charges with respect to the Transmission System being established by the Rajasthan IV 4A Power Transmission Limited (a 100% wholly owned subsidiary of Power Grid Corporation of India Limited). 

POWERGRID Ghiror Transmission Limited,

Versus

Central Transmission Utility of India Limited, REC Power Development and Consultancy Limited,  NTPC Renewable Energy Limited, & 43 Others

Background:

The Petitioner, POWERGRID Ghiror Transmission Limited (erstwhile Rajasthan IV 4A Power Transmission Limited) (hereinafter referred to as “the Petitioner”), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) to establish the Inter-State “Transmission system for evacuation of power from Rajasthan REZ Ph -IV (Part-4: 3.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related