CERC: Petition for adoption of Transmission Charges with respect to Transmission System; Rajasthan Part I Power Trans.

Application under Section 63 of the Electricity Act, 2003 for the adoption of Transmission Charges with respect to the Transmission System being established by Rajasthan Part I Power Transmission Limited. 

Rajasthan Part I Power Transmission Limited

Versus

Central Transmission Utility of India Limited, REC Power Development and Consultancy Limited, Power Grid Corporation of India Limited & 13 Others

Background:

The Petitioner, Rajasthan Part I Power Transmission Limited (hereinafter referred to as “the Petitioner”), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) for the adoption of transmission charges to establish the “Transmission System For Evacuation of Power From REZ In Rajasthan (20 GW) Under Phase-III Part I” on a Build, Own, Operate and Transfer basis (hereinafter referred to as “the Project”).