CERC: Petition for approval of tariff of Tanda Thermal Power Station, Stage-II (1320 MW) from COD of Unit-I

Petition for approval of tariff of Tanda Thermal Power Station, Stage-II (1320 MW) for the period from COD of Unit-I (i.e., 7.11.2019) to 31.3.2024.

NTPC Limited

Versus

Uttar Pradesh Power Corporation Limited, Uttarakhand Power Corporation Limited, Rajasthan Urja Vikas Nigam Limited, & 3 Others

Background:

This Petition has been filed by the Petitioner, NTPC Limited, under Section 79(1)(a) of the Electricity Act, 2003 for the approval of tariff of Tanda Super Thermal Power Station, Stage-II (1320 MW) (in short ‘the Project/generating station’) for the period from the COD of Unit-I (i.