• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
January 06,2025

CERC: Petition for Approval of truing & determination of Transmission Tariff from 2019-24 & 2024-29 under combined asset

Power Grid Corporation of India Limited

Versus

Tamil Nadu Generation and Distribution Corporation Limited, Kerala State Electricity Board Limited & 12 others

Background

The instant Petition has been filed by Power Grid Corporation of India Limited for the truing-up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as “the 2019 Tariff Regulations”) and for the determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 (hereinafter referred to as “the 2024 Tariff Regulations”) in respect of the combined asset, namely LILO of 2nd circuit of Neyveli-Trichy 400 kV D/C line at Nagapattinam Pooling Station along with associated bays, and Strengthening of Neyveli TS-II-TS-I expansion link with higher capacity conductor (hereinafter referred to as “the combined asset”) under the “Transmission System associated with contingency plan for evacuation of power from IL&FS (2x600 MW)” (hereinafter referred to as “the transmission scheme”) in the Southern Region.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related