• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
August 19,2025

CERC: Petition for determination of transmission tariff for transmission System for development of Pooling Station in WB

Power Grid Corporation of India Limited

Versus

Assam Electricity Grid Corporation Limited,  Meghalaya Energy Corporation Limited, & 70 Others

Background:

The instant Petition has been filed by Power Grid Corporation of India Limited, for truing up of transmission tariff for the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 (hereinafter referred to as “the 2014 Tariff Regulations”) and for determination of tariff for the 2019- 24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as “the 2019 Tariff Regulations”) with respect to the following transmission assets under “Transmission System for development of pooling station in Northern part of West Bengal and transfer of power from Bhutan to NR/WR" in Northern and Western Region (hereinafter referred to as “the transmission scheme”) truing up of Transmission Tariff for the 2014-19 Tariff Period and Determination of Transmission Tariff for the 2019-24 Tariff Period for Asset1: 02 Nos.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related