• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
2 hours ago

CERC: Petition for POWERGRID Mahan Rewa seeks adoption of Transmission Charges

Application under Section 63 of the Electricity Act, 2003, for the adoption of Transmission Charges with respect to the Transmission System being established by the POWERGRID Mahan Rewa Transmission Limited (a 100% wholly owned subsidiary of Power Grid Corporation of India Limited).

POWERGRID Mahan Rewa Transmission Limited

Versus

Central Transmission Utility of India Limited, PFC Consulting Limited,  Chhattisgarh State Power Distribution Company Limited & 21 Others

Background:

The Petitioner, POWERGRID Mahan Rewa Transmission Limited, (erstwhile MEL Power Transmission Limited), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) for the adoption of transmission charges to establish the Inter-State Transmission System for “Transmission System for evacuation of power from Mahan Energen Limited Generating Station in Madhya Pradesh” (hereinafter referred to as “Project”) on a Build, Own, Operate and Transfer Basis (hereinafter referred to as “BOOT Basis”).

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related