CERC: Petition for seeking adoption of Transmission Charges of Transmission Scheme for evacuation of power (Ratle HEP)

Petition under Section 63 of the Electricity Act, 2003 seeking adoption of Transmission Charges of the “Transmission Scheme for evacuation of power from Ratle HEP (850 MW) & Kiru HEP (624 MW): Part A” being established by the Petitioner. 

Ratle Kiru Power Transmission Limited,

Versus

Central Transmission Utility of India Limited,  REC Power Development and Consultancy Limited, Central Electricity Authority & 23 Others

Background:

The Petitioner, Ratle Kiru Power Transmission Limited, has filed the present Petition under Section 63 of the Electricity Act, 2003 read with Section 79(1)(c) & (d) of the Electricity Act, 2003 (hereinafter “the Act”) seeking the adoption of transmission tariff discovered through the tariff based competitive bidding process for the purpose of selection of the Bidder as the Transmission Service Provider (TSP) to establish the Inter-State Transmission System for the “Transmission scheme for evacuation of power from Ratle HEP (850MW) & Kiru HEP (624) MW: Part-A” on a Build, Own, Operate and Transfer Basis (hereinafter referred to as “BOOT Basis”).