Petition under Section 63 of the Electricity Act, 2003 for Adoption of Tariff discovered through Competitive Bidding Process for Supply of 6000 MWh (1500 MW x 4 hours) Assured Peak Power from ISTS- connected Renewable Energy (RE) Power Projects with Energy Storage System (ESS) anywhere in India.
SJVN Limited
Versus
Reliance NU Energies Private Limited, ACME Solar Holdings Limited, Sembcorp Green Infra Private Limited & Solarcraft Power India 8 Private Limited
Background:
The Petitioner, SJVN Limited, has filed the present Petition under Section 63 of the Electricity Act, 2003 (herein referred to as “The Act”) for the adoption of tariff discovered through competitive bidding process for supply of 6000 MWh (1500 MW x 4 hours) Assured Peak Power from ISTS- connected Renewable Energy (RE) Power Projects with Energy Storage System (ESS) anywhere in India, as per the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems (hereinafter referred to as “the Guidelines”) of the Ministry of Power (herein referred to as “MoP”), Government of India (hereinafter referred to as “GoI”) dated 9.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.