Review of Commission’s order on revision of tariff for 2014-2019 and 2019-2024 for Tanakpur Hydroelectric Power Station

Petition No. 144/GT/2020 was filed by the Review Petitioner, NHPC India Ltd, for truing-up of the tariff of Tanakpur Hydroelectric Power Station (3 x 31.4 MW) (in short, “the generating station”) for the 2014-19 tariff period in accordance with the provisions of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 (in short, 'the 2014 Tariff Regulations') and the Commission, vide order dated 5.