• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
January 13,2025

CERC RoP: Petition for Adoption of Tariff for Setting up of 1200 MW ISTS-connected Solar PV Power Projects (Solar-2)

SJVN Limited (SJVN) Versus ACME Solar Holdings Limited and Ors.

Record of Proceedings

Learned counsel for the Petitioner submitted that the present Petition had been filed seeking the adoption of the tariff of the 1200 MW inter-State Transmission System (ISTS) connected with the Solar PV Projects discovered through the tariff based competitive bidding process as per the “Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Solar PV Projects” dated 28.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related