CERC RoP: Petition for determination of tariff of Talcher Thermal Power Station (460 MW) for the period from Apr19-Mar24

NTPC Ltd Versus GRIDCO Ltd

Record of Proceedings

The case was heard through a virtual hearing.

2. At the outset, the learned counsel for the Petitioner requested time to file additional information sought vide RoP of the hearing dated 23.10.2024. The learned counsel for the Respondent also requested time to file its reply on the additional information to be filed by the Petitioner.