CERC RoP: Petition for determination of transmission tariff from the COD to 31.3.2024 for 2 Nos. 400 kV line bays

Power Grid Corporation of India Limited (PGCIL) Versus Madhya Pradesh Power Management Company Limited and 9 others

Record of Proceedings

Learned counsel for MUML submitted that as per the TSA, the SCOD of MUML’s transmission asset was 22.12.2023. However, due to the Covid-19 pandemic, the Ministry of Power (MoP) granted an extension of 8 months to all the transmission projects.