CERC RoPs: Petition for Adoption of Transmission Charges with respect to the Transmission System; BAPTL

Application under Section 63 of the Electricity Act, 2003 for Adoption of Transmission Charges with respect to the Transmission System being established by the Bikaner A Power Transmission Limited (a 100% wholly owned subsidiary of Power Grid Corporation of India Limited).

Bikaner A Power Transmission Limited (BAPTL)

Versus

Central Transmission Utility of India Limited (CTUIL) & Ors

Record of Proceedings

The representative of the Petitioner submitted that the present Petitions had been filed seeking the adoption of transmission charges discovered through the competitive bidding process for the “Transmission System for evacuation of power from Rajasthan REZ Ph-IV (Part-3: 6GW) [Bikaner complex]: Part A” (the “Project”) and for the grant of a transmission licence for establishing the Project.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related