CERC RoPs: Petition for determination of project-specific tariff for 100 MW (AC)/ 155.02 MWp (DC) Solar PV power plant

Petition for determination of project-specific tariff for 100 MW (AC)/ 155.02 MWp (DC) Solar PV power plant with 40/120 MWh of Battery Storage at Rajnandgao, Chhattisgarh for a period of 25 years from Commercial Operation Date (COD) of the project.

Solar Energy Corporation of India Limited (SECI)

Versus

Chhattisgarh State Power Distribution Company Limited (CSPDCL)

Record of Proceedings

Heard the learned Senior counsel for the Petitioner and the learned counsel for the Respondent, at length.