A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/omnicoreplus.com/public_html/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/omnicoreplus.com/public_html/index.php
Line: 272
Function: require_once

Omnicore: Real-Time Regulatory and Policy Updates for India's Energy and Infrastructure Sectors
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
June 30,2025

GERC: Petition of FSGE Renewable v/s GETCO for extension of time period to commission entire evacuation infrastructure

Petitioner: FSGE Renewable Private Limited

Versus

Gujarat Energy Transmission Corporation Limited

Background: Petition under Section 86 (1) (c) (e) and (f) of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations, 2004 seeking directions for extension of time period for commission the entire evacuation infrastructure due to unforeseen and uncontrollable events.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related