GERC: Petition of GSP Intermediates v/s GETCO for extension of time period for commissioning of entire evacuation infra

Petitioner: M/s GSP Intermediates Private Limited

Versus

Gujarat Energy Transmission Corporation Limited, The Additional Chief Engineer Gujarat Energy Transmission Corp. Limited. & Energy and Petrochemicals Department Government of Gujarat

Background: Petition under Section 86 (1) (c) (e) & (f) of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations, 2004 seeking directions for extension of time period for commissioning the entire evacuation infrastructure along with commissioning of the project till 31.