GERC: Petition of Imandra Solar Pvt Ltd v/s GETCO for extension of time period for commissioning entire evacuation infra

Petitioner: Imandra Solar Private Limited

Versus

Gujarat Energy Transmission Corporation Limited

Background: Petition under Section 86 (1) (c), (e) of the Electricity Act, 2003 read with Regulations 80 and 82 of GERC (Conduct of Business) Regulations, 2004 seeking directions for extension of time period for commissioning the entire evacuation infrastructure due to occurrence of unforeseen and uncontrollable events.