A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/omnicoreplus.com/public_html/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/omnicoreplus.com/public_html/index.php
Line: 272
Function: require_once

Omnicore: Real-Time Regulatory and Policy Updates for India's Energy and Infrastructure Sectors
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
November 25,2025

GERC: Petition of Kintech Solarbikaner v/s GETCO for extension of time for construction of evacuation infrastructure

Petitioner: Kintech Solarbikaner Private Limited

Versus

Gujarat Energy Transmission Corporation Ltd

Background: Petition under Section 86 (1) (c) (e) and other applicable provisions of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business) Regulations 2004 seeking extension of time period for construction of the evacuation infrastructure and quashing of the letter dated 07.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related