GERC: Petition of KPI Green Energy v/s GETCO for extension of time period for commissioning of 5.5MW Wind Solar Hybrid

Petitioner: KPI Green Energy Limited

Versus

Gujarat Energy Transmission Corp. Limited.

Background: Petition under Section 86 (1) (c) (e) and (f) of the Electricity Act, 2003 read with Regulations 80 and 85 of the GERC (Conduct of Business) Regulations, 2004 seeking directions for extension of time period for commissioning of the 5.