Petitioner: Tisza Solar Pvt. Limited
Versus
Gujarat Energy Transmission Corp. Ltd.
Background: Petition under Section 86 (1) (c), (e) & (f) and other applicable provisions of the Electricity Act, 2003 read with Regulations 80 & 82 of the GERC (Conduct of Business) Regulations, 2004 seeking extension of the time period for construction of the evacuation infrastructure and quashing of the letter dated 13.