GERC: Petition of Tisza Solar v/s GETCO for extension of time period for construction of the evacuation infrastructure

Petitioner: Tisza Solar Pvt. Limited

Versus

Gujarat Energy Transmission Corp. Ltd.

Background: Petition under Section 86 (1) (c), (e) & (f) and other applicable provisions of the Electricity Act, 2003 read with Regulations 80 & 82 of the GERC (Conduct of Business) Regulations, 2004 seeking extension of the time period for construction of the evacuation infrastructure and quashing of the letter dated 13.