GERC: Petition under Section 86(1) (f) of the Electricity Act, 2003 read with Article 10 of the PPA dated 30.04.2010 and amended PPA dated 07.08.2010 for adjudication of dispute between the Petitioner and the Respondent regarding Solar power generation at its fullest installed capacity of 11.5 MW as per the terms of the PPA by repairing solar

pending final disposal of the Petition, pass an interim order permitting the Petitioner to install damaged/ degraded solar PV modules in context with the contracted capacity of 11.5 MW considering the permissible CUF as per the GERC Tariff order and to carry out other necessary repair works in the Solar Power Plant so as to enable the Petitioner to operate the Solar Power Plant at the installed capacity of 11.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related