pending final disposal of the Petition, pass an interim order permitting the
Petitioner to install damaged/ degraded solar PV modules in context with the
contracted capacity of 11.5 MW considering the permissible CUF as per the
GERC Tariff order and to carry out other necessary repair works in the Solar
Power Plant so as to enable the Petitioner to operate the Solar Power Plant
at the installed capacity of 11.