HPERC: Before Hon’ble HPERC in the Matter of HPSEB Ltd. V/s HPSLDC, HPPTCL, HPPCL, DOE and Himurja

Petitioner: The HP State Electricity Board Limited

Versus

The HP State Load Despatch Center, The HP Power Transmission Corporation Limited, The HP Power Corporation Limited. & The HIMURJA

Background: This Petition has been filed by the Himachal Pradesh State Electricity Board Limited (HPSEBL/ Petitioner) under Section 86 (1) (i) of the Electricity Act, 2003, seeking approval of Resource Adequacy Plan (RAP) for a 10-year horizon (Long-term Distribution Licensee Resource Adequacy Plan (LT-DRAP)) to meet peak electrical energy requirement at optimal cost to the system.