Implementation Plan:
The minimum solar capacity to be developed by the developer shall not be less than 500 KW. Interested developers shall identify suitable land for the development of solar projects. And carry out the preliminary study to identify the likely nearest evacuation point of (feeder/substation) in the existing STU or DISCOM network.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.