KERC: Increasing the limit of contract demand up to 55 MVA from the current limit of 35 MVA under 110 KV supply voltage

The Commission has received a request from the EHT consumer that for availing power supply at 110 kV level, it is required to increase the limit of Contract Demand (CD) from the present 35 MVA as provided in the Conditions of Supply (CoS) to 55 MVA in view of practical difficulties to avail 220 KV supply, stating that it is technically feasible as the conductor proposed from the 110/11 KV KPTCL’s substation to the consumer premises is capable of withstanding the increased CD.