• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
May 05,2025

NTPC Issues tender for EPC package for development of 250 MW/1000 MWh BESS at NTPC Kayamkulam

Brief Scope of Work for EPC package for development of Battery Energy Storage System (BESS) at NTPC Kayamkulam (250 MW/1000 MWh)

Design, Engineering, Supply, Packing and Forwarding, Transportation, Unloading, Storage, Installation and Commissioning of grid connected 250 MW/1000 MWhr Battery Energy Storage System (BESS) on turnkey basis.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related