• Infographics
  • Check Pricing
  • Newsletter
  • Login
October 24,2024

Petitioner THDC get approval by CERC for approval for allowance of the drawl of start-up power from the grid Khurja TPS

THDC India Limited, Pragati Puram, Bypass Road, Rishikesh-249 201 (Uttarakhand)

Versus

Grid Controller of India Limited, Uttar Pradesh Power Corporation Limited & Others

Background: 

This Petition has been filed by the Petitioner, THDC India Limited (hereinafter referred to as ‘THDCIL’), under Regulation 19 of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023 (hereinafter referred to as ‘the Grid Code’), as amended from time to time, with the following prayers:

“a) Admit the present Petition;

b) Allow the drawl of start-up power from the grid for a period of Six months from 28.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related