• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
October 16,2024

RoPs: Petition for Adoption of tariff for 1200 MW Wind Solar Hybrid Power Projects with assured Peak Power Supply

Solar Energy Corporation of India Limited (SECI) Versus AMP Energy Green Private Limited & Ors

Record of Proceedings

Learned counsel for the Petitioner submitted that the present Petition has been filed seeking the adoption of tariff of the 1200 MW Wind Solar Hybrid Power Projects with assured Peak Power Supply (Tranche–VI) connected with the Inter-State Transmission System (ISTS) and selected through the competitive bidding process as per the “Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Projects” dated 14.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related