• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
October 22,2024

RoPs: Petition for Adoption of the tariff of 1200 MW ISTS Solar PV Power Projects with 600 MW/1200 MWh ESS

Solar Energy Corporation of India Limited (SECI) Versus ACME Solar Holdings Limited and Ors. 

Record of Proceedings

Learned counsel for the Petitioner submitted that the present Petition had been filed for the adoption of tariff for the 1200 MW Solar Power Projects connected with the inter-state Transmission System (ISTS) with the 600 MW/ 1200 MWh Energy Storage System and selected through the competitive bidding process as per the “Guidelines for Tariff Based Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems” dated 9.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related