• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
October 25,2024

RoPs: Petition for Fixation of final tariff for the 92 MW Floating Solar Photo Voltaic Plant at RGCCP

KSEBL Versus NTPC Limited

Subject: Petition for determination of project specific levelized tariff for 92 MW floating soar Photo Voltaic Plants in two phases (first phase 22 MW and second phase 70 MW) at Rajiv Gandhi Combined Cycle Power Project (RGCCP) Kayamkulam, Kerala. 

Record of Proceedings

Based on the consent of the learned counsel for both parties, the matter was adjourned.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related