• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
July 09,2025

UERC: Petition of Opto Electronics v/s UPCL for permission to install Grid Interactive Rooftop Solar PV Plant beyond 1MW

Petitioner: M/s Opto Electronics Pvt. Ltd, Dehradun

Versus

Uttarakhand Power Corporation Ltd. (UPCL) & Uttarakhand Renewable Energy Development Agency (UREDA)

Background: The Order relates to the Petition dated 16.01.2025 filed by Opto Electronics Factory, a Unit of India OPTEL seeking permission to install additional capacity of 600 kW over and above the ceiling limit specified for Grid Interactive Rooftop & Small Solar PV plants in UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023 (hereinafter referred to as “RE Regulations, 2023) in accordance with the Ministry of New and Renewable Energy (MNRE) letter dated 03.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related