• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
September 30,2026

UERC: Petition of RE Power Generators Society v/s UPCL for review in Capacity Utilization Factor of Solar Plant

Petitioner: RE Power Generators Society

Versus

Uttarakhand Power Corporation Ltd. & Uttarakhand Renewable Energy Development Agency

Background: RE Power Generators Society has filed a present Petition on 16.06.2026 seeking review/ modification of Capacity Utilisation Factor (CUF) specified under UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations 2023 (“RE Regulations, 2023”).

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related