• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
4 hours ago

UPERC: Petition of UPNEDA JBML Green Energy for PPA approval, procurement tariff from solar plant with 2553.5MW capacity

Petitioner: U.P. New & Renewable Energy Development Agency (UPNEDA) & Uttar Pradesh Power Corporation Ltd. (UPPCL)

Versus

Fusionx Asia Pacific Private Limited, JBML Green Energy Private Limited & V.M. Power

Background: Petition under Section 63 read with Section 86(1)(b) of the Electricity Act, 2003 and Regulation 15 of the UPERC (Conduct of Business) Regulations, 2019 seeking approval of the Power Purchase Agreements executed between respective Project Developers and UPPCL, and adoption of tariff discovered pursuant to the Request for Selection (RfS) issued for procurement of power through TBCB process from grid-connected solar plants proposed be connected to designated segregated agriculture feeder of the distribution substation aggregating to a cumulative capacity of 2553.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related