Petitioner: Damodar Valley Corporation
Background: The Damodar Valley Corporation (DVC) submitted an application vide letter dated 29.07.2025 (received on 06.08.2025) for approval of Power Sale Agreement (PSA) dated 11.06.2025 executed with National Hydroelectric Power Corporation Ltd (NHPC) in terms of Section 63 read with Section 86(1)(B) of the Electricity Act, 2003 for sale of Inter-State Transmission System (ISTS) connected 'Firm & Dispatchable RE' (FDRE) Power (assured peak power supply) with Energy Storage System (ESS) on Long Term basis for a contracted capacity of 250 MW Solar & 250MW/1 150 MWh Battery Energy Storage System (BESS) on built, own and operate basis located at Kharnai, Tahsil - Rawatbhata, district- Chittogarh, Rajasthan in terms of regulation 7.
Premium Content Access
This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.