WBERC: Petition of WBPDCL for Investment Approval for Installation & Commissioning of 200MW (AC) Floating Solar Plant

Petitioner: West Bengal Power Development Corporation Limited (WBPDCL)

Background: The West Bengal Power Development Corporation Limited (WBPDCL) submitted a petition on 17.12.2025 seeking ‘in-principle clearance’ in respect of Investment Approval for Installation and Commissioning of 200 MW (AC) Floating Solar Plant along with 80 MW x 4 Hours Battery Energy Storage System (BESS) at Bakreswar reservoir of Bakreswar Thermal Power Station (“BkTPS reservoir”) of WBPDCL at an estimated project cost of Rs.