A PHP Error was encountered

Severity: Warning

Message: opendir(/var/lib/lsphp/session/lsphp80): Failed to open directory: Permission denied

Filename: drivers/Session_files_driver.php

Line Number: 365

Backtrace:

File: /home/omnicoreplus.com/public_html/application/controllers/Default_Controler.php
Line: 7
Function: __construct

File: /home/omnicoreplus.com/public_html/index.php
Line: 272
Function: require_once

Omnicore: Real-Time Regulatory and Policy Updates for India's Energy and Infrastructure Sectors
  • Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
October 13,2025

WBSEDCL issues Tender for 250 MW/1000MWh Standalone BESS with Additional Green shoe Option in West Bengal

West Bengal State Electricity Distribution Company Limited (WBSEDCL) is inviting bids for the development of a 250 MW / 1000 MWh Standalone Battery Energy Storage System (BESS) under a Build, Own, Operate (BOO) model, with an additional Greenshoe option of another 250 MW / 1000 MWh. The project will be located at Goaltore Substation, Paschim Midnapore, with a minimum voltage level of 132 kV.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related