• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
6 hours ago

CERC: CERC Adopts Transmission Charges for POWERGRID Bellary Davanagere Renewable Energy Integration Project

Application under Section 63 of the Electricity Act, 2003 for the adoption of Transmission Charges with respect to the Transmission System being established by the Bellary Davanagere Power Transmission Limited (a 100% wholly owned subsidiary of Power Grid Corporation of India Limited).

POWERGRID Bellary Davanagere Transmission Limited,

Versus

Central Transmission Utility of India Limited, REC Power Development and Consultancy Limited, Andhra Pradesh Power Purchase Coordination Committee, Banglore Electricity Supply Company  & 22 Others

Background:

The Petitioner, POWERGRID Bellary Davanagere Transmission Limited (erstwhile Bellary Davanagere Power Transmission Limited), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) for the adoption of transmission charges to establish the Inter-State Transmission System for the “Transmission system strengthening for integration of additional RE potential at Davanagere (0.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related