• Infographics
  • Insights
  • Check Pricing
  • Newsletter
  • Login
September 28,2026

CERC: Grants Khaba 45-Day Infirm Power Extension For 38.1 MW Solar Balance

Petition under Sections 79(1)(c) and 79(1)(k) of the Electricity Act, 2003 read with Regulation 19(3) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024 seeking extension of time for injection of infirm power for the balance capacity and extend or direct NRLDC to extend the time for First Time Charging for the balance capacity; and under Regulation 57 of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023 read with Regulation 65 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 seeking relaxation/condonation of delay for filing the present Petition

Khaba Renewable Energy Private Limited

Versus

Northern Regional Load Despatch Centre (NRLDC)

Background:

The ‘Khaba Renewable Energy Private Limited’ (hereinafter referred to as ‘Petitioner) has filed the present Petition seeking extension of time for injection of infirm power and extend or direct NRLDC to extend the time for First Time Charging in respect of the balance capacity of its 250 MW solar power project and also the condonation of delay for filing the present Petition under Regulation 57 of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023 (herein after referred to as ‘’Grid Code’) read with Regulation 65 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023.

Premium Content Access

This content is available exclusively to our paid subscribers. Please login to enjoy full access. If you’re interested in subscribing to access our premium content, please contact us at support@omnicoreplus.com.

Related