CERC: Petition for adoption of tariff for the 100 MW Solar PV Power Project (Tranche- VIII), SECI

Petition under Section 63 of the Electricity Act, 2003 for the adoption of tariff for the 100 MW Solar PV Power Project (Tranche- VIII) connected with the Inter-State Transmission System (ISTS) and selected through competitive bidding process as per the guidelines of the Government of India. 

Solar Energy Corporation of India Limited,

Versus

AMP Energy Green Private Limited, AMPIN Energy Green Four Private Limited, & West Bengal State Electricity Distribution Company Limited

Background:

The Petitioner, Solar Energy Corporation of India Limited (hereinafter referred to as “SECI”), has filed the present Petition under Section 63 of the Electricity Act, 2003 (hereinafter referred to as “the Act”) for the adoption of tariff for the 100 MW Solar PV Power Projects (Tranche-VIII) connected with the Inter-State Transmission System (hereinafter referred to as “ISTS”) and selected through the competitive bidding process as per the “Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Solar PV Power Projects” (hereinafter referred to as “the Guidelines”) dated 3.